Skip to main content
MODUL’OPEN

European manufacturing

From the factory to your plot, module by module.

A MODUL’OPEN home is made of volumetric modules manufactured in a factory, in Europe. Each module is designed, built, inspected and protected, then transported and assembled on your plot. Here is that journey, step by step.

Journey
Five steps, from design to assembly
System
Volumetric modules
Production
Factory-built, in Europe

The journey in detail

Five steps, one standard of precision.

Each step has its role, its tasks and its checkpoints. Together, they form a project thought through from start to finish, from the first sketch to the last module set in place.

From plan to modular volume
Layout plan drawn on a grid, turning into modular volumes
Photo of the design office — to be provided

01Design

A project designed to be manufactured.

It all starts with composing your home from volumetric modules: architecture, structure, and manufacturing and transport constraints are studied together.

What happens

Based on your needs, your plot and the chosen configuration, the project is broken down into modules. Plans, structure, services and finishes are coordinated, then translated into manufacturing drawings for the factory.

Why it matters

The more precise the project is upfront, the less room it leaves for improvisation. Design geared to the factory aims to make manufacturing, transport and installation more reliable.

Checkpoints

  • Feasibility with regard to the plot and access
  • Consistency between architecture, structure and services
  • Manufacturing drawings finalized before production starts
Assembly in the factory
Module being assembled on its jig, under a gantry crane, in the factory
Photo of the factory floor — to be provided

02Manufacturing

Modules manufactured in the factory, in Europe.

The modules take shape in prefabrication factories, sheltered from the weather, following organized assembly sequences.

What happens

Each module is assembled at a dedicated workstation: floor, frame, walls, integrated services, then finishes, depending on the level of prefabrication planned for the project.

Why it matters

A controlled environment allows more consistent, more precise work than outdoors. Manufacturing moves forward while the plot is being prepared, which aims to shorten the overall project timeline — depending on the configuration, the site and the permits.

Checkpoints

  • Compliance with the manufacturing drawings
  • Module geometry and squareness
  • Integrated services checked before the walls are closed

To be providedOur manufacturing sites will appear on this page’s map as soon as their details have been verified.

Inspection and measurements
Finished module under inspection: measuring gantry, inspection points and verified dimensions
Photo of an inspection in the factory — to be provided

03Quality control

Verify in the factory rather than correct on site.

Inspections accompany manufacturing at every step, followed by a final check before each module is shipped.

What happens

Checkpoints are defined for each manufacturing step: dimensions, assemblies, services and finishes. Any deviations are dealt with in the factory, before the module leaves.

Why it matters

Rework in the factory takes less time and fewer resources than rework on site. These inspections aim to deliver modules that are ready to install.

Checkpoints

  • Dimensional and squareness checks
  • Inspection of integrated services
  • Finish inspection before shipping

To be providedThe detailed inspection protocol will be presented here once approved.

Between the factory and the road

Preparing each module for the journey.

A finished module must arrive on the plot in the condition it left the factory. Its preparation is an integral part of manufacturing.

Detail · Module prepared for shipping
Module wrapped and strapped on timber blocks, lifting points ready for shipping
  1. Protection

    Facades, openings and sensitive parts are protected against the weather and against chafing in transit.

  2. Blocking and tie-down

    The module rests on blocks and is strapped down to stay stable during loading and on the road.

  3. Lifting points

    Lifting points are prepared for safe handling, from loading at the factory through to installation.

  4. Labeling

    Each module is labeled according to its installation order, for smooth unloading on site.

Photo of a protected module before shipping — to be provided
Transporting the module
Protected module carried on a low-loader semi-trailer
Photo of a module convoy — to be provided

04Transport

Logistics planned before the first kilometer.

Transporting a module is planned alongside the project itself: its dimensions, its route and its arrival on the plot are studied upfront.

What happens

The modules are loaded onto suitable trailers and carried by road along a pre-studied route. Deliveries are scheduled with progress on site, so that each module arrives when it is due to be installed.

Why it matters

Coordinated delivery limits on-site storage, waiting times and extra handling.

Checkpoints

  • Route and access checked before departure
  • Load securing checked at loading
  • Condition of the modules checked on arrival

Road constraints

What the road demands of the project.

Road transport shapes the design of the modules and the organization of the site. These constraints are studied for each project.

  1. Road size limits

    A module’s width, height and length are designed for road travel. Beyond certain sizes, an oversize-load convoy and special permits may be required.

  2. Route

    Bridges, structures, roundabouts, tight bends, village crossings: the route to the plot is studied before delivery.

  3. Site access

    Road width, slope, ground bearing capacity and maneuvering space determine how trucks reach the installation area.

  4. Lifting

    The crane’s position, its reach and any obstacles — power lines, trees, neighboring buildings — are checked upfront.

  5. Time slots and permits

    Temporary road occupancy, traffic hours, neighbors: the formalities are handled ahead of time, in step with the site schedule.

  6. Weather

    Wind and bad weather can affect lifting: the schedule includes a margin to adapt.

Site preparation: excavator, utility trench, pipes and spoil
Site preparation in parallel with manufacturing

Logistics sheet

Maximum module dimensions
To be confirmed
Indicative module weight
Technical specifications pending validation
Delivery area
To be provided
Lifting equipment
Defined for each project, depending on the site
Site access
Studied during the feasibility analysis

Reference data being validated by MODUL’OPEN. It will be published here, without approximation.

Installation, module by module
Mobile crane setting a module on its foundations, next to the modules already installed
Video of on-site installation — to be provided

05Assembly

On site, the house is set in place module by module.

On the plot, the foundations are ready. Assembly begins: a site phase designed to be shorter and less disruptive than traditional construction, depending on the configuration, the site and the permits.

What happens

The modules are lifted by crane and set on their foundations in the planned order, then aligned, fixed and connected to each other and to the utilities. Joint finishes and the final works are carried out on site.

Why it matters

With most of the work done in the factory, the site work focuses on installation, connections and finishes, which aims to limit disruption for the neighbors.

Checkpoints

  • Foundations inspected before installation
  • Alignment and fixing of each module
  • Connections and finishes checked before handover

The installation sequence

  1. 01

    Foundations ready

    Supports built and inspected as per the project, utility stub-outs in place.

  2. 02

    Delivery

    The modules arrive in the planned installation order.

  3. 03

    Lifting and setting

    Each module is lifted, set down, then aligned on its supports.

  4. 04

    Connections

    Module-to-module connections, services and envelope continuity.

  5. 05

    Finishes

    Joint treatment, exterior and interior finishes.

Foundations ready: concrete pads, connection plates and utility stub-outs
Foundations and connection points

Schedule drawn up for each project

The duration of assembly depends on the number of modules, site access, the weather and the finishes to be completed on site. That is why we do not give a generic duration.

Sites and markets

Where we manufacture, where we deliver.

The map will show our manufacturing sites and the markets we serve, only once this information has been verified.

Legend

  • Manufacturing sites
  • Markets served
  • European countries
To be provided

Manufacturing sites and markets served are to be provided — they will appear here once validated.

Albania, No verified information for this country
Andorra, No verified information for this country
Austria, No verified information for this country
Belarus, No verified information for this country
Belgium, No verified information for this country
Bosnia & Herzegovina, No verified information for this country
Bulgaria, No verified information for this country
Croatia, No verified information for this country
Cyprus, No verified information for this country
Czechia, No verified information for this country
Denmark, No verified information for this country
Estonia, No verified information for this country
Finland, No verified information for this country
France, No verified information for this country
Germany, No verified information for this country
Greece, No verified information for this country
Hungary, No verified information for this country
Iceland, No verified information for this country
Ireland, No verified information for this country
Italy, No verified information for this country
Kosovo, No verified information for this country
Latvia, No verified information for this country
Liechtenstein, No verified information for this country
Lithuania, No verified information for this country
Luxembourg, No verified information for this country
Malta, No verified information for this country
Moldova, No verified information for this country
Monaco, No verified information for this country
Montenegro, No verified information for this country
Netherlands, No verified information for this country
North Macedonia, No verified information for this country
Norway, No verified information for this country
Poland, No verified information for this country
Portugal, No verified information for this country
Romania, No verified information for this country
Russia, No verified information for this country
San Marino, No verified information for this country
Serbia, No verified information for this country
Slovakia, No verified information for this country
Slovenia, No verified information for this country
Spain, No verified information for this country
Sweden, No verified information for this country
Switzerland, No verified information for this country
Ukraine, No verified information for this country
United Kingdom, No verified information for this country
CountryNo country selected
Position—
Status—

Hover over or tap a country to identify it. With the keyboard: arrow keys to browse, Esc to clear.

Lambert azimuthal equal-area projection, centered on 52° N, 10° E · Natural Earth base map (1:110,000,000 scale)

Manufacturing sites and markets served are to be provided — they will appear here once validated.

Common questions

Manufacturing, transport, installation: your questions.

A question about your plot or your project? Our team is here to answer.

Contact us
Where are MODUL’OPEN modules manufactured?

The modules are manufactured in factories in Europe. Our manufacturing sites will be presented on this page, with their locations, as soon as their details have been verified.

Why manufacture in a factory rather than on site?

The factory offers a controlled environment: organized workstations, suitable tooling, work sheltered from the weather. Manufacturing can move forward while the plot is being prepared, which aims to shorten the time on site — depending on the configuration, the site and the permits.

Are the modules inspected before they leave?

Yes. Inspections accompany every manufacturing step and a final check is carried out before shipping. The detailed inspection protocol will be presented here once approved.

How big is a module?

Dimensions depend on the project and on road transport constraints. The reference dimensions of our modules will be published here as soon as they have been validated.

How are the modules brought to the plot?

By road, after a study of the route and access. Depending on their dimensions, some loads may require special permits. The arrangements are defined for each project.

Does my plot need to be accessible to a crane?

The modules are installed using lifting equipment. Truck access, the crane’s position and any obstacles are studied during your project’s feasibility analysis.

How long does on-site assembly take?

It depends on the number of modules, site access, the weather and the finishes to be completed on site. A schedule is drawn up for each project: we do not give a generic duration.

Do you deliver throughout Europe?

The markets we serve will be shown on the map as soon as they have been verified. To find out whether your project can be studied, contact us.

Your project

Let’s talk about your plot and your home.

Every project is studied according to the plot, the desired configuration and access conditions. Compose your home or write to us.